Networking
Parts LocationInstallation
INSTALLATION
PROCEDURE
1. INSTALL NO. 2 COOLING FAN MOTOR
(a) Install the No. 2 cooling fan motor with the 3 screws.
Torque:
w/o Towing package :
2.6 N·m {26 kgf·cm, 23 in·lbf}
w/ Towing package :
3.9 N·m {40 kgf·cm, 35 in ...
Engine
General Maintenance
GENERAL MAINTENANCE
CAUTION / NOTICE / HINT
HINT:
Perform these procedures after the engine has cooled down.
PROCEDURE
1. INSPECT DRIVE BELT
Engine Type
See Procedure
2GR-FE
See pag ...
Actuator Supply Voltage Circuit / Open (P0657)
MONITOR DESCRIPTION
The ECM monitors the output voltage to the throttle actuator. This self-check
ensures that the ECM is functioning properly. The output voltage is usually 0 V
when the ignition switch is turned off. If the output voltage is higher than ...