ComponentsInstallation
INSTALLATION
PROCEDURE
1. INSTALL FRONT DOOR FRONT WINDOW FRAME MOULDING
(a) Engage the front door front window frame moulding to the door frame.
(b) Using an air riveter or hand riveter with a nose ...
Abnormal Temperature Inside ID1 Tire (C2165/65-C2168/68)
DESCRIPTION
Each tire pressure warning valve and transmitter measures the tire internal temperature
as well as tire pressure, and transmits the information to the tire pressure warning
ECU along with the transmitter ID. If the measured temperature is out ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT PRELOAD
(a) Using SST and a torque wrench, measure the preload of the backlash
between the driven pinion and ring gear.
SST: 09326-20011
Preload (at Starting):
Item
P ...