Installation
ComponentsInstallation
INSTALLATION
PROCEDURE
1. INSTALL NO. 2 WINDSHIELD GLASS STOPPER
(a) Using a brush or a sponge, coat the application area of 2 new No. 2 windshield
glass stoppers with Primer G.
NOTICE:
Do not apply too much primer.
Allow the primer to dry f ...
Automatic air conditioning system
Airflow and outlets are automatically adjusted according to the temperature
setting.
► Control panel
► Multi-information display (TFT type)
The settings display will differ according to the situation. If
is pressed while in automat ...
Reassembly
REASSEMBLY
PROCEDURE
1. PRECAUTION
NOTICE:
After turning the ignition switch off, waiting time may be required before disconnecting
the cable from the negative (-) battery terminal. Therefore, make sure to read the
disconnecting the cable from the nega ...