Installation
ComponentsInspection
INSPECTION
PROCEDURE
1. INSPECT TIE ROD ASSEMBLY LH
(a) Secure the tie rod assembly LH in a vise.
(b) Install the nut to the stud bolt.
(c) Flip the ball joint back and forth 5 times.
(d) Set a to ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL REAR DOOR COURTESY LIGHT SWITCH
(a) Using "TORX" socket wrench T30, install the rear door courtesy light
switch with the "TORX" bolt.
Torque:
8.0 N·m {82 kgf·cm, 71 in·lbf}
...
Disposal
DISPOSAL
CAUTION / NOTICE / HINT
CAUTION:
Before performing pre-disposal deployment of any SRS component, review and closely
follow all applicable environmental and hazardous material regulations. Pre-disposal
deployment may be considered hazardous mate ...