Installation
ComponentsInspection
INSPECTION
PROCEDURE
1. INSPECT UNIVERSAL JOINT SPIDER ASSEMBLY
(a) Check the spider bearing axial play by turning the flange while holding
the shaft tightly.
HINT:
If necessary, replace the propeller with center bearing shaft assembly. ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL FRONT NO. 3 SPEAKER ASSEMBLY (for 13 Speakers)
(a) Engage the 3 claws to install the front No. 3 speaker assembly.
2. INSTALL FRONT PILLAR GARNISH CORNER PIECE (for ...
Runnable Signal Malfunction (B2286,P0335)
DESCRIPTION
The power management control ECU receives an engine speed signal and information
that indicates whether the engine is running or not. It receives the engine speed
signal from the ECM via a direct line, and the information about whether the eng ...