Installation
ComponentsReassembly
REASSEMBLY
PROCEDURE
1. INSTALL NO. 2 STEERING RACK BOOT
(a) Apply lithium soap base glycol grease to the inside of the small
opening of a new No. 2 steering rack boot.
(b) Install the No. 2 ste ...
Starter Relay Circuit High (P0617)
MONITOR DESCRIPTION
While the engine is being cranked, battery voltage is applied to terminal STA
of the ECM. If the ECM detects the Starter Control (STA) signal while the vehicle
is being driven, it determines that there is a malfunction in the STA circu ...
CD cannot be Ejected
PROCEDURE
1.
CHECK OPERATION
(a) Press the CD eject switch of the navigation receiver assembly for 10 seconds
or more and check that the CD is ejected.
OK:
CD is ejected.
NG
REPLACE NAVIGATION RECEIVER ...