ComponentsInstallation
INSTALLATION
PROCEDURE
1. INSTALL NO. 2 COOLING FAN MOTOR
(a) Install the No. 2 cooling fan motor with the 3 screws.
Torque:
w/o Towing package :
2.6 N·m {26 kgf·cm, 23 in·lbf}
w/ Towing package :
3.9 N·m {40 kgf·cm, 35 in ...
On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. CHECK POWER SOURCE MODE CHANGE FUNCTION
(a) Check the function of the engine switch.
(1) Check that power source mode changes in accordance with the conditions of
the shift position and brake pedal.
Brake Pe ...
Removal
REMOVAL
PROCEDURE
1. REMOVE AUTOMATIC TRANSAXLE ASSEMBLY (for 2GR-FE)
See page
2. REMOVE AUTOMATIC TRANSAXLE ASSEMBLY (for 1AR-FE)
See page
3. REMOVE TRANSFER ASSEMBLY
(a) Remove the 2 bolts and 6 nuts.
...