Toyota Venza manuals

Toyota Venza: Cooling Fan System

Installation
INSTALLATION PROCEDURE 1. INSTALL NO. 2 COOLING FAN MOTOR (a) Install the No. 2 cooling fan motor with the 3 screws. Torque: w/o Towing package : 2.6 N·m {26 kgf·cm, 23 in· ...

Precaution
PRECAUTION NOTICE: When the ignition switch is turned off and the engine temperature is high, the cooling fans may operate for a maximum of 6 minutes. After turning the ignition swit ...

Other materials about Toyota Venza:

How To Proceed With Troubleshooting
HOW TO PROCEED WITH TROUBLESHOOTING 1. OPERATION FLOW HINT: Perform troubleshooting in accordance with the procedure below. The following is an outline of basic troubleshooting procedure. Confirm the troubleshooting procedure for the circuit you are wor ...

Removal
REMOVAL PROCEDURE 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL CAUTION: Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system. NOTICE: When disconnecting the cable, some systems ne ...

Installation
INSTALLATION PROCEDURE 1. TEMPORARILY TIGHTEN COMPRESSOR AND MAGNETIC CLUTCH (a) Temporarily install the compressor and magnetic clutch and bracket with the 4 bolts. 2. INSTALL COMPRESSOR AND MA ...

© 2016-2026 Copyright www.tovenza.com

0.1584