Toyota Venza manuals

Toyota Venza: Cooling Fan System

Installation
INSTALLATION PROCEDURE 1. INSTALL NO. 2 COOLING FAN MOTOR (a) Install the No. 2 cooling fan motor with the 3 screws. Torque: w/o Towing package : 2.6 N·m {26 kgf·cm, 23 in· ...

Precaution
PRECAUTION NOTICE: When the ignition switch is turned off and the engine temperature is high, the cooling fans may operate for a maximum of 6 minutes. After turning the ignition swit ...

Other materials about Toyota Venza:

Inspection
INSPECTION PROCEDURE 1. INSPECT FRONT SEAT FRAME WITH ADJUSTER LH (a) Check operation of the seat frame (slide motor). (1) w/ Memory: Check if the seat frame moves smoothly when the battery is connected to the slide motor connector termin ...

Rear window defogger
Clear the rear window using the defogger. On/off The defogger will automatically turn off after 15 or 60 minutes. This operation time changes according to the ambient temperature and vehicle speed. Pressing the switch again also turns the defogger off. ...

Installation
INSTALLATION PROCEDURE 1. INSTALL MANUAL VALVE (a) Coat the manual valve with ATF and install it to the transmission valve body assembly. 2. SUPPORT ENGINE ASSEMBLY 3. INSTALL TRANSMISSION VALVE BODY ASSEMBLY (a) Coat the O-ring of the transmission ...

© 2016-2026 Copyright www.tovenza.com

0.1664