Toyota Venza manuals

Toyota Venza: 1ar-fe Emission Control

Toyota Venza Service Manual / 1ar-fe Emission Control

Installation
INSTALLATION PROCEDURE 1. INSTALL WATER PUMP ASSEMBLY (a) Install a new gasket and the water pump with the 7 bolts. Torque: 21 N·m {214 kgf·cm, 15 ft·lbf} ...

Canister
...

Other materials about Toyota Venza:

Removal
REMOVAL PROCEDURE 1. PRECAUTION (See page ) NOTICE: After turning the ignition switch off, waiting time may be required before disconnecting the cable from the negative (-) battery terminal. Therefore, make sure to read the disconnecting the cable fr ...

Installation
INSTALLATION PROCEDURE 1. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY (a) Apply a light coat of engine oil to 2 new oil pump gaskets and new oil hole cover gasket. (b) Install the 2 new oil pump gas ...

Coolant
Replacement REPLACEMENT PROCEDURE 1. REMOVE NO. 1 ENGINE UNDER COVER 2. REMOVE NO. 2 ENGINE UNDER COVER 3. DRAIN ENGINE COOLANT (a) Loosen the radiator drain cock plug and drain the coolant. NOTICE: Do not remove the reserve tank cap or radiator drai ...

© 2016-2026 Copyright www.tovenza.com

0.1893