Toyota Venza manuals

Toyota Venza: Refrigerant

Installation
INSTALLATION PROCEDURE 1. INSTALL NO. 1 COOLER THERMISTOR (a) Install the No. 1 cooler thermistor as shown in the illustration. Part Length ...

On-vehicle Inspection
ON-VEHICLE INSPECTION PROCEDURE 1. INSPECT REFRIGERANT PRESSURE WITH MANIFOLD GAUGE SET HINT: This is a method where a manifold gauge set is used to help locate the problem. (a) Read the manifold ...

Other materials about Toyota Venza:

Inspection
INSPECTION PROCEDURE 1. INSPECT TRANSMISSION OIL CLEANER MAGNET (a) Use the removed transmission oil cleaner magnets to collect any steel chips. Examine the chips and particles in the automatic transaxle oil pan sub-assembly and on the tr ...

Reassembly
REASSEMBLY PROCEDURE 1. INSTALL FUEL PUMP ASSEMBLY WITH FILTER HINT: Perform "Inspection After Repair" after replacing the fuel pump (See page ). (a) Apply gasoline to a new O-ring. Then install the O-ring and spacer to the fuel ...

Installation
INSTALLATION PROCEDURE 1. ADJUST COMPRESSOR OIL LEVEL (a) When replacing the cooler compressor assembly with a new one, gradually discharge the inert gas (helium) from the service valve, and drain the following amount of oil from the vent ...

© 2016-2026 Copyright www.tovenza.com

0.1355