Toyota Venza manuals

Toyota Venza: Park / Neutral Position Switch

Reassembly
REASSEMBLY PROCEDURE 1. INSTALL FRONT OIL PUMP OIL SEAL (a) Using SST and a hammer, install a new oil seal to the oil pump body. SST: 09350-32014 09351-32140 Oil seal driven in ...

Components
COMPONENTS ILLUSTRATION ...

Other materials about Toyota Venza:

Differential System
Precaution PRECAUTION Before disassembly, clean the outside of the differential assembly and remove any sand or mud to prevent it from entering the inside of the assembly during disassembly and installation. When removing an installed pa ...

Installation
INSTALLATION PROCEDURE 1. INSTALL FUEL SUCTION TUBE ASSEMBLY WITH PUMP AND GAUGE (a) Install a new fuel suction tube set gasket onto the fuel tank. (b) Connect the fuel tube with the clip. (c) Set ...

Installation
INSTALLATION CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH side and LH side. The procedure listed below is for the LH side. PROCEDURE 1. INSTALL REAR AXLE HUB AND BEARING ASSEMBLY (a) Install the parking bra ...

© 2016-2026 Copyright www.tovenza.com

0.126