INSTALLATION
PROCEDURE
1. INSTALL HEADLIGHT ASSEMBLY
(a) Connect each connector.
(b) Install the headlight assembly with the bolt and 3 screws.
Torque:
3.6 N·m {37 kgf·cm, 32 in·lbf}
2. INSTALL FRONT BUMPER ASSEMBLY
(See page )
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (for HID Headlight)
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable
is reconnected (See page ).
4. ADJUST HEADLIGHT AIMING
(See page )
5. ADJUST FOG LIGHT AIMING
(See page )
Speed Signal Circuit
DESCRIPTION
The headlight leveling ECU assembly receives the vehicle speed signal from the
combination meter assembly.
HINT:
A voltage of 12 V or 5 V is output from each ECU and then input to the
combination meter. The signal is changed to a p ...
Test Mode Procedure
TEST MODE PROCEDURE
1. WARNING LIGHT AND INDICATOR LIGHT INITIAL CHECK
(a) Release the parking brake.
NOTICE:
Before releasing the parking brake, move the shift lever to P for safety.
HINT:
When the parking brake is applied or the brake fluid level is lo ...
Seat heaters
1. For driver’s seat
2. For front passenger’s seat
3. On
The indicator light comes on.
4. Adjusts the seat temperature
The further you turn the dial upward, the warmer the seat becomes.
- The seat heaters can be used when
►Vehicles wit ...