Toyota Venza manuals

Toyota Venza: Compressor(for 1ar-fe)

Installation
INSTALLATION PROCEDURE 1. INSTALL NO. 1 COOLER THERMISTOR 2. INSTALL COOLER EVAPORATOR SUB-ASSEMBLY 3. INSTALL BLOWER ASSEMBLY WITH COOLER EVAPORATOR SUB-ASSEMBLY (a) Engage the 5 claws. ( ...

Components
COMPONENTS ILLUSTRATION ILLUSTRATION ...

Other materials about Toyota Venza:

Coolant
Replacement REPLACEMENT PROCEDURE 1. REMOVE NO. 1 ENGINE UNDER COVER 2. REMOVE NO. 2 ENGINE UNDER COVER 3. DRAIN ENGINE COOLANT (a) Loosen the radiator drain cock plug and drain the coolant. NOTICE: Do not remove the reserve tank cap or radiator drai ...

Removal
REMOVAL PROCEDURE 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL CAUTION: Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system (See page ). NOTICE: When disconnecting the cable, s ...

Removal
REMOVAL PROCEDURE 1. REMOVE REAR WHEELS 2. REMOVE CENTER EXHAUST PIPE ASSEMBLY (a) Remove the center exhaust pipe assembly. HINT: Refer to the instructions for Removal of the exhaust pipe (See page for 2GR-FE, for 1AR-FE). 3. REMOVE LOWER NO. 1 EXH ...

© 2016-2026 Copyright www.tovenza.com

0.141