Toyota Venza manuals

Toyota Venza: Compressor(for 1ar-fe)

Installation
INSTALLATION PROCEDURE 1. INSTALL NO. 1 COOLER THERMISTOR 2. INSTALL COOLER EVAPORATOR SUB-ASSEMBLY 3. INSTALL BLOWER ASSEMBLY WITH COOLER EVAPORATOR SUB-ASSEMBLY (a) Engage the 5 claws. ( ...

Components
COMPONENTS ILLUSTRATION ILLUSTRATION ...

Other materials about Toyota Venza:

Console boxes
► Front Press the tab and slide to open. ► Rear 1. Pull up the lever to release the lock. 2. Slide the armrest fully rearward. 3. Lift the armrest to open.  - When using the rear console box lid as an armrest If necessary, the con ...

Reassembly
REASSEMBLY PROCEDURE 1. INSTALL COOLER DRYER (a) Using pliers, install a new cooler dryer to the modulator. (b) Apply sufficient compressor oil to the O-ring and fitting surfaces of t ...

Removal
REMOVAL PROCEDURE 1. REMOVE REAR DOOR SCUFF PLATE RH HINT: Use the same procedure for the RH side and the LH side (See page ). 2. REMOVE REAR DOOR OPENING TRIM WEATHERSTRIP RH HINT: Use the same procedure for the RH side and the LH side (See page ). ...

© 2016-2026 Copyright www.tovenza.com

0.1768