INSTALLATION
PROCEDURE
1. INSTALL NO. 1 COOLER THERMISTOR
2. INSTALL COOLER EVAPORATOR SUB-ASSEMBLY
3. INSTALL BLOWER ASSEMBLY WITH COOLER EVAPORATOR SUB-ASSEMBLY
(a) Engage the 5 claws.
(b) Engage the guide and connect the wire harness.
(c) Install the blower assembly with cooler evaporator sub-assembly to the air conditioning radiator assembly with the 6 screws.
4. INSTALL COOLER EXPANSION VALVE
5. INSTALL AIR CONDITIONING HARNESS ASSEMBLY
6. INSTALL NO. 2 AIR DUCT SUB-ASSEMBLY
7. INSTALL NO. 3 AIR DUCT SUB-ASSEMBLY
8. INSTALL NO. 2 FINISH PANEL MOUNTING BRACKET
9. INSTALL NO. 1 FINISH PANEL MOUNTING BRACKET
10. INSTALL AIR CONDITIONING UNIT ASSEMBLY
(See page )
Installation
INSTALLATION
PROCEDURE
1. INSPECT TORQUE CONVERTER ASSEMBLY
2. INSTALL TORQUE CONVERTER ASSEMBLY
(a) Engage the splines of the input shaft and turbine runner.
(b) Engage the splines o ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT ENGINE SWITCH
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Switch Condition
Specified Condition
7 (SS1) ...
Open or Short Circuit in ABS Solenoid Relay Circuit (C0278/11)
DESCRIPTION
The ABS solenoid relay supplies power to the ABS solenoid and TRAC solenoid.
The solenoid relay is turned on 1.5 seconds after the ignition switch is turned
to ON, and is turned off if an open or short in the solenoid is detected by self
diag ...