INSPECTION
PROCEDURE
1. INSPECT FRONT SEATBACK HEATER LH
|
(a) Apply battery voltage and check the seatback heater. OK:
If the result is not as specified, replace the front seatback heater. NOTICE: Immediately after confirming that the seat heater is functioning normally, remove the battery leads. Failing to do so may cause the seat heater to overheat. |
|
Removal
InstallationDoor Control Switch
Components
COMPONENTS
ILLUSTRATION
Inspection
INSPECTION
PROCEDURE
1. INSPECT DOOR CONTROL SWITCH ASSEMBLY
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Conn ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL REAR POWER POINT SOCKET COVER
(a) Engage the 2 claws to install the rear power point socket cover.
2. INSTALL REAR POWER POINT SOCKET ASSEMBLY
(a) Engag ...
Headlight Signal Circuit
DESCRIPTION
The headlight leveling ECU assembly detects the low beam headlights status.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
NOTICE:
First check that the low beam headlights operate normally.
PROCEDURE
1.
CHECK HARNESS AND CON ...