Customizable featuresRelay
On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT RR DEF RELAY
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Condition
...
Reassembly
REASSEMBLY
PROCEDURE
1. INSTALL NO. 14 ROOF SILENCER PAD
(a) Align the markings on the roof headlining assembly with the No. 14 roof silencer
pad and install the silencer pad using hot-melt glue as shown in the illustration.
2. INSTALL NO. 1 ROOF WIRE ...
Data List / Active Test
DATA LIST / ACTIVE TEST
1. USING TECHSTREAM
(a) Connect the Techstream to the DLC3.
(b) Monitor the ECU data by following the prompts on the Techstream screen.
HINT:
The Techstream has a "Snapshot" function which records the monitored data. Refe ...