PRECAUTION
1. Check that the battery cables are connected to the correct terminals.
2. Disconnect the battery cables when the battery is given a quick charge.
3. Do not perform tests with a high voltage insulation resistance tester.
4. Never disconnect the battery cables while the engine is running.
5. Check that the charging cable nut is tightened on terminal B of the generator and the engine room relay block.
Parts Location
System DiagramReassembly
REASSEMBLY
PROCEDURE
1. INSTALL NO. 2 STEERING RACK BOOT
(a) Apply lithium soap base glycol grease to the inside of the small
opening of a new No. 2 steering rack boot.
(b) Install the No. 2 ste ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT CHARCOAL CANISTER ASSEMBLY
(a) Visually check the charcoal canister assembly.
(1) Visually check the charcoal canister assembly for cracks or damage.
If cracks or damage are found, replace the charcoal canister ...
Data List / Active Test
DATA LIST / ACTIVE TEST
1. USING TECHSTREAM
(a) Connect the Techstream to the DLC3.
(b) Monitor the ECU data by following the prompts on the Techstream screen.
HINT:
The Techstream has a "Snapshot" function which records the monitored data. Refe ...