INSTALLATION
PROCEDURE
1. INSTALL WATER PUMP ASSEMBLY
(a) Install a new gasket and the water pump with the 7 bolts. Torque: 21 N·m {214 kgf·cm, 15 ft·lbf} |
|
2. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
3. INSTALL GENERATOR ASSEMBLY
4. INSTALL WIRE HARNESS CLAMP BRACKET
5. INSTALL V-RIBBED BELT
HINT:
See page
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ).
7. ADD ENGINE COOLANT
8. INSPECT FOR COOLANT LEAK
9. INSTALL COOL AIR INTAKE DUCT SEAL
10. INSTALL NO. 1 ENGINE UNDER COVER
11. INSTALL NO. 2 ENGINE UNDER COVER
12. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
Inspection
INSPECTION
PROCEDURE
1. INSPECT OUTER MIRROR SWITCH ASSEMBLY (w/o Memory)
(a) The L position of the left/right adjustment switch: Measure the resistance
according to the value(s) in the table below.
Standard Resistance (for Left Side):
Tes ...
One or more Power Seat Motors do not Operate
DESCRIPTION
Signals are input into the position control ECU and switch assembly. The built-in
ECU manages the signals received from the position control ECU and switch assembly,
and operates each motor. If the position control ECU and switch assembly rece ...
On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION
(a) Apply the parking brake.
(b) Turn the ignition switch to ON.
(c) Depress the brake pedal and check that the engine starts when the shift lever
is in N or P, b ...