INSTALLATION
PROCEDURE
1. INSTALL WATER PUMP ASSEMBLY
|
(a) Install a new gasket and the water pump with the 7 bolts. Torque: 21 N·m {214 kgf·cm, 15 ft·lbf} |
|
2. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
3. INSTALL GENERATOR ASSEMBLY
4. INSTALL WIRE HARNESS CLAMP BRACKET
5. INSTALL V-RIBBED BELT
HINT:
See page
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable
is reconnected (See page
).
7. ADD ENGINE COOLANT
8. INSPECT FOR COOLANT LEAK
9. INSTALL COOL AIR INTAKE DUCT SEAL
10. INSTALL NO. 1 ENGINE UNDER COVER
11. INSTALL NO. 2 ENGINE UNDER COVER
12. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
RemovalWireless Door Lock Buzzer
Components
COMPONENTS
ILLUSTRATION
Installation
INSTALLATION
PROCEDURE
1. INSTALL WIRELESS DOOR LOCK BUZZER
(a) Engage the clamp and install the wireless door lock buzzer.
(b) Connect the ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT NO. 1 ULTRASONIC SENSOR
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Condition
Specified ...
Precaution
PRECAUTION
1. EXPRESSIONS OF IGNITION SWITCH
(a) The type of ignition switch used on this model differs according to the specifications
of the vehicle. The expressions listed in the table below are used in this section.
Switch Type
I ...