INSTALLATION
PROCEDURE
1. INSTALL WATER PUMP ASSEMBLY
|
(a) Install a new gasket and the water pump with the 7 bolts. Torque: 21 N·m {214 kgf·cm, 15 ft·lbf} |
|
2. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
3. INSTALL GENERATOR ASSEMBLY
4. INSTALL WIRE HARNESS CLAMP BRACKET
5. INSTALL V-RIBBED BELT
HINT:
See page
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable
is reconnected (See page
).
7. ADD ENGINE COOLANT
8. INSPECT FOR COOLANT LEAK
9. INSTALL COOL AIR INTAKE DUCT SEAL
10. INSTALL NO. 1 ENGINE UNDER COVER
11. INSTALL NO. 2 ENGINE UNDER COVER
12. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
RemovalGlove Box Light
Components
COMPONENTS
ILLUSTRATION
Inspection
INSPECTION
PROCEDURE
1. INSPECT GLOVE BOX LIGHT ASSEMBLY
(a) Connect a positive (+) lead from the battery to terminal 1 and a
negative (-) lead to terminal 2.
...
Removal
REMOVAL
CAUTION / NOTICE / HINT
HINT:
Perform "Inspection After Repair" after replacing the fuel pump assembly (See
page ).
PROCEDURE
1. DISCHARGE FUEL SYSTEM PRESSURE
(a) Discharge fuel system pressure (See page
).
2. DISCONNECT CABLE FR ...
Precaution
PRECAUTION
1. PRECAUTION FOR DISCONNECTING BATTERY CABLE
NOTICE:
When disconnecting the cable from the negative (-) battery terminal, initialize
the following systems after the cable is reconnected.
System
See Procedure
...