Toyota Venza manuals

Toyota Venza: Installation

INSTALLATION

PROCEDURE

1. INSTALL WATER PUMP ASSEMBLY

(a) Install a new gasket and the water pump with the 7 bolts.

Torque:

21 N·m {214 kgf·cm, 15 ft·lbf}


2. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY


3. INSTALL GENERATOR ASSEMBLY


4. INSTALL WIRE HARNESS CLAMP BRACKET


5. INSTALL V-RIBBED BELT

HINT:

See page


6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ).


7. ADD ENGINE COOLANT


8. INSPECT FOR COOLANT LEAK


9. INSTALL COOL AIR INTAKE DUCT SEAL


10. INSTALL NO. 1 ENGINE UNDER COVER

11. INSTALL NO. 2 ENGINE UNDER COVER

12. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY


Removal
REMOVAL PROCEDURE 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ). 2. RE ...

1ar-fe Emission Control
...

Other materials about Toyota Venza:

Removal
REMOVAL PROCEDURE 1. REMOVE BACK DOOR PANEL TRIM ASSEMBLY 2. REMOVE REAR WIPER ARM HEAD CAP (a) Disengage the 4 claws and remove the rear wiper arm head cap as shown in the illustration. 3. ...

Installation
INSTALLATION PROCEDURE 1. INSTALL FRONT NO. 3 SPEAKER ASSEMBLY (for 13 Speakers) (a) Engage the 3 claws to install the front No. 3 speaker assembly. 2. INSTALL FRONT PILLAR GARNISH CORNER PIECE (for ...

Do-it-yourself service precautions
If you perform maintenance yourself, be sure to follow the correct procedure given in these sections. CAUTION The engine compartment contains many mechanisms and fluids that may move suddenly, become hot, or become electrically energized. To avoid de ...