INSTALLATION
PROCEDURE
1. INSTALL WATER PUMP ASSEMBLY
|
(a) Install a new gasket and the water pump with the 7 bolts. Torque: 21 N·m {214 kgf·cm, 15 ft·lbf} |
|
2. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
3. INSTALL GENERATOR ASSEMBLY
4. INSTALL WIRE HARNESS CLAMP BRACKET
5. INSTALL V-RIBBED BELT
HINT:
See page
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable
is reconnected (See page
).
7. ADD ENGINE COOLANT
8. INSPECT FOR COOLANT LEAK
9. INSTALL COOL AIR INTAKE DUCT SEAL
10. INSTALL NO. 1 ENGINE UNDER COVER
11. INSTALL NO. 2 ENGINE UNDER COVER
12. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
RemovalElectrical Key Oscillator(for Rear Side)
Components
COMPONENTS
ILLUSTRATION
Removal
REMOVAL
PROCEDURE
1. REMOVE REAR BUMPER PLATE LH
2. REMOVE REAR BUMPER PLATE RH
3. REMOVE REAR BUMPER ASSEMBLY
4. REMOVE ELECTRICAL KEY ANTENNA
(a) Disconnect the connector.
...
Precaution
PRECAUTION
NOTICE:
When disconnecting the cable from the negative (-) battery terminal, initialize
the following systems after the cable is reconnected.
System Name
See Procedure
Back Door Closer System
...
Heated Oxygen Sensor
Components
COMPONENTS
ILLUSTRATION
Removal
REMOVAL
PROCEDURE
1. REMOVE NO. 1 ENGINE UNDER COVER
2. REMOVE NO. 2 ENGINE UNDER COVER
3. REMOVE FRONT EXHAUST PIPE ASSEMBLY
4. REMOVE HEATED OXYGEN SENSOR
(a) Using SST, remove the heat ...