INSTALLATION
CAUTION / NOTICE / HINT
HINT:
PROCEDURE
1. INSTALL REAR AXLE HUB AND BEARING ASSEMBLY
|
(a) Install the parking brake assembly and the rear axle hub and bearing assembly with the 4 bolts. Torque: 80 N·m {816 kgf·cm, 59 ft·lbf} NOTICE: Do not twist the No. 3 parking brake cable assembly when installing it. |
|
2. INSPECT REAR AXLE HUB BEARING LOOSENESS
3. INSPECT REAR AXLE HUB RUNOUT
4. INSTALL REAR SPEED SENSOR WIRE
5. INSTALL REAR DISC
6. INSTALL REAR DISC BRAKE CALIPER ASSEMBLY
7. INSTALL REAR FLEXIBLE HOSE
8. INSTALL REAR WHEEL
Torque:
103 N·m {1050 kgf·cm, 76 ft·lbf}
9. CHECK FOR SPEED SENSOR SIGNAL
(a) Check for the speed sensor signal (See page
).
RemovalPrecaution
PRECAUTION
1. WHEN DISCONNECTING CABLE FROM NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable from the negative (-) battery terminal, initialize
the following systems after the cable is reconnected.
System Name
See Proc ...
Front Stabilizer Bar(for 1ar-fe 2wd)
Components
COMPONENTS
ILLUSTRATION
Inspection
INSPECTION
PROCEDURE
1. INSPECT FRONT STABILIZER LINK ASSEMBLY
(a) Inspect the turning torque of the ball joint.
(1) Secure the front stabilizer link assembly in a vise using aluminum
...
Terminals Of Ecm
TERMINALS OF ECM
HINT:
The standard voltage between each pair of ECM terminals is shown in the table
below. The appropriate conditions for checking each pair of terminals are also indicated.
The result of checks should be compared with the standard vol ...