INSTALLATION
PROCEDURE
1. INSTALL FRONT NO. 3 SPEAKER ASSEMBLY (for 13 Speakers)
|
(a) Engage the 3 claws to install the front No. 3 speaker assembly. |
|
2. INSTALL FRONT PILLAR GARNISH CORNER PIECE (for 13 Speakers)
3. INSTALL FRONT NO. 2 SPEAKER ASSEMBLY
|
(a) Connect the connector. |
|
|
(b) Install the front No. 2 speaker assembly with the 2 bolts. Torque: 11 N·m {112 kgf·cm, 8 ft·lbf} |
|
4. INSTALL NO. 1 INSTRUMENT PANEL SPEAKER PANEL SUB-ASSEMBLY
5. INSTALL FRONT NO. 4 SPEAKER ASSEMBLY (for 13 Speakers)
|
(a) Connect the connector. |
|
(b) Install the center speaker assembly with the 2 bolts.
Torque:
11 N·m {112 kgf·cm, 8 ft·lbf}
6. INSTALL NO. 2 INSTRUMENT PANEL SPEAKER PANEL SUB-ASSEMBLY
7. INSTALL FRONT PILLAR GARNISH
8. CONNECT FRONT DOOR OPENING TRIM WEATHERSTRIP
Inspection
Luggage SpeakerSystem Diagram
SYSTEM DIAGRAM
Communication Table
Sender
Receiver
Signal
Line
ECM
Combination Meter ECU
CRUISE main indicator operation signal
SET indicator operation sig ...
Installation
INSTALLATION
CAUTION / NOTICE / HINT
HINT:
Use the same procedure for the RH side and LH side.
The procedure listed below is for the LH side.
PROCEDURE
1. INSTALL REAR AXLE HUB AND BEARING ASSEMBLY
(a) Apply a total of 0.1 to 0.3g (0.00 ...
Installation
INSTALLATION
PROCEDURE
1. CLEAN QUARTER WINDOW ASSEMBLY
(a) Clean the outer edges of the quarter window assembly with a non-residue
solvent.
NOTICE:
Do not touch the glass surface after cleaning it.
Be careful not to ...