INSTALLATION
PROCEDURE
1. INSTALL FRONT NO. 3 SPEAKER ASSEMBLY (for 13 Speakers)
(a) Engage the 3 claws to install the front No. 3 speaker assembly. |
|
2. INSTALL FRONT PILLAR GARNISH CORNER PIECE (for 13 Speakers)
3. INSTALL FRONT NO. 2 SPEAKER ASSEMBLY
(a) Connect the connector. |
|
(b) Install the front No. 2 speaker assembly with the 2 bolts. Torque: 11 N·m {112 kgf·cm, 8 ft·lbf} |
|
4. INSTALL NO. 1 INSTRUMENT PANEL SPEAKER PANEL SUB-ASSEMBLY
5. INSTALL FRONT NO. 4 SPEAKER ASSEMBLY (for 13 Speakers)
(a) Connect the connector. |
|
(b) Install the center speaker assembly with the 2 bolts.
Torque:
11 N·m {112 kgf·cm, 8 ft·lbf}
6. INSTALL NO. 2 INSTRUMENT PANEL SPEAKER PANEL SUB-ASSEMBLY
7. INSTALL FRONT PILLAR GARNISH
8. CONNECT FRONT DOOR OPENING TRIM WEATHERSTRIP
Tire information
Typical tire symbols
►Standard tire
►Compact spare tire
1. Tire size
2. DOT and Tire Identification Number (TIN)
3. Location of treadwear indicators
4. Tire ply composition and materials Plies are layers of rubber-coated parallel
cords ...
Components
COMPONENTS
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
...
Installation
INSTALLATION
PROCEDURE
1. INSTALL NO. 1 COOLER THERMISTOR
2. INSTALL COOLER EVAPORATOR SUB-ASSEMBLY
3. INSTALL BLOWER ASSEMBLY WITH COOLER EVAPORATOR SUB-ASSEMBLY
(a) Engage the 5 claws.
(b) Engage the guide and connect the wire harness.
(c) Insta ...