INSPECTION
PROCEDURE
1. INSPECT UNLOCK WARNING SWITCH ASSEMBLY
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
|
Tester Connection |
Condition |
Specified Condition |
|---|---|---|
|
1 - 2 |
Switch free (Key removed) |
10 kΩ or higher |
|
1 - 2 |
Switch pushed (Key set) |
Below 1 Ω |
|
*1 |
Component without harness connected (Unlock Warning Switch Assembly) |
If the result is not as specified, replace the unlock warning switch assembly.
Components
RemovalDiagnosis System
DIAGNOSIS SYSTEM
1. DESCRIPTION
When troubleshooting OBD II (On-Board Diagnostics) vehicles, an OBD
II scan tool (complying with SAE J1987) must be connected to the DLC3 (Data
Link Connector 3) of the vehicle. Various data in the vehicle ECM ( ...
System Diagram
SYSTEM DIAGRAM
Communication Table
Transmitting ECU
Receiving ECU
Signal
Communication Method
Air Conditioning Control Assembly
Air Conditioning Amplifier Assembly
Rear windo ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL REAR DOOR COURTESY LIGHT SWITCH
(a) Using "TORX" socket wrench T30, install the rear door courtesy light
switch with the "TORX" bolt.
Torque:
8.0 N·m {82 kgf·cm, 71 in·lbf}
...