INITIALIZATION
1. INITIALIZE SLIDING ROOF ECU (SLIDING ROOF DRIVE GEAR SUB-ASSEMBLY)
NOTICE:
HINT:
When the cable of the negative (-) battery terminal is disconnected and reconnected or the drive gear connector is disconnected and reconnected, the sliding roof drive gear (pulse sensor initial position setting) initialization is not necessary.
(a) Perform initialization according to the table below.
|
Condition of Sliding Roof |
Proceed to |
|---|---|
|
Auto slide open and tilt up functions do not operate |
Procedure A |
|
Sliding roof moves in reverse direction during slide close (tilt down) operation |
Procedure B |
|
Sliding roof does not stop at the correct fully closed position during tilt down operation |
Procedure C |
HINT:
Before performing initialization, make sure that there is no foreign matter on the guide rails and the guide rails are not deformed.
(1) Procedure A
NOTICE:
Make sure not to release the switch during the initialization. If the switch is released, perform the initialization again.
HINT:
The initialization process ends when this operation completes.
(2) Procedure B
(3) Procedure C
HINT:
The initialization process ends when this operation completes.
Operation Check
Problem Symptoms TableHow To Proceed With Troubleshooting
CAUTION / NOTICE / HINT
PRECAUTIONS WHEN TROUBLESHOOTING
NOTICE:
DTCs for the CAN communication system are as follows: U0073, U0100,
U0101, U0123, U0124, U0126, U0129, U0131, U0142, U0155, U0164, U0182, U0199,
U0200, U0208, U0230, U1002 and ...
On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT BRAKE BOOSTER ASSEMBLY
(a) Airtightness check
(1) Start the engine and stop it after 1 or 2 minutes. Slowly depress
the brake pedal several times.
HINT:
If the pedal can be depressed to the ...
Rear Wheel House Plate
Components
COMPONENTS
ILLUSTRATION
Installation
INSTALLATION
PROCEDURE
1. INSTALL NO. 2 ROCKER PANEL MOULDING PROTECTOR
(a) Install the No. 2 rocker panel moulding protector with the 2 screws
<B>.
...