Toyota Venza manuals

Toyota Venza: Disassembly

DISASSEMBLY

PROCEDURE

1. REMOVE STEERING RACK BOOT CLIP (for LH Side)

(a) Using pliers, remove the steering rack boot clip.

2. REMOVE STEERING RACK BOOT CLIP (for RH Side)

HINT:

Perform the same procedure as for the LH side.

3. REMOVE NO. 2 STEERING RACK BOOT CLAMP

(a) Using a screwdriver, remove the No. 2 steering rack boot clamp.

NOTICE:

Be careful not to damage the steering rack boot.


4. REMOVE NO. 1 STEERING RACK BOOT CLAMP

HINT:

Perform the same procedure as for the No. 2 steering rack boot clamp.

5. REMOVE NO. 2 STEERING RACK BOOT

6. REMOVE NO. 1 STEERING RACK BOOT

Removal
REMOVAL CAUTION / NOTICE / HINT NOTICE: When disconnecting the steering intermediate shaft assembly and pinion shaft of the steering gear assembly, be sure to place matchmarks before servicing. ...

Inspection
INSPECTION PROCEDURE 1. INSPECT TIE ROD ASSEMBLY LH 2. INSPECT TIE ROD ASSEMBLY RH HINT: Perform the same procedure as for the LH side. 3. INSPECT TOTAL PRELOAD ...

Other materials about Toyota Venza:

Air Fuel Ratio Sensor
Components COMPONENTS ILLUSTRATION Removal REMOVAL PROCEDURE 1. REMOVE NO. 1 ENGINE COVER SUB-ASSEMBLY 2. REMOVE COOL AIR INTAKE DUCT SEAL 3. REMOVE INLET AIR CLEANER ASSEMBLY 4. REMOVE NO. 1 EXHAUST MANIFOLD HEAT INSULATOR 5. REMOV ...

Inspection
INSPECTION PROCEDURE 1. INSPECT SPIRAL CABLE (a) Visually check for defects with the spiral cable removed from the vehicle. (1) The defects are as follows: Scratches on the spiral cable Small cracks the spiral cable Dents on the spiral cabl ...

Coolant
Replacement REPLACEMENT PROCEDURE 1. REMOVE NO. 1 ENGINE UNDER COVER 2. REMOVE NO. 2 ENGINE UNDER COVER 3. DRAIN ENGINE COOLANT (a) Loosen the radiator drain cock plug and drain the coolant. NOTICE: Do not remove the reserve tank cap or radiator drai ...

© 2016-2026 Copyright www.tovenza.com

0.1337