Installation
INSTALLATION
PROCEDURE
1. INSTALL FUEL PRESSURE REGULATOR ASSEMBLY
(a) Apply a light coat of gasoline to 2 new O-rings, and install them
onto the fuel pressure regulator.
Text in Illustration
*1
New O-r ...
VSC OFF Indicator Light does not Come ON
DESCRIPTION
The skid control ECU is connected to the combination meter via CAN communication.
WIRING DIAGRAM
Refer to VSC OFF Indicator Light Remains ON (See page
).
PROCEDURE
1.
CHECK CAN COMMUNICATION SYSTEM
(a) Check ...
Disassembly
DISASSEMBLY
PROCEDURE
1. REMOVE COOLER DRYER
(a) Using a 14 mm straight hexagon wrench, remove the cap from the modulator.
Text in Illustration
*1
14 mm Straight Hexagon Wrench
*2 ...