Toyota Venza manuals

Toyota Venza: ECU Power Source Circuit

DESCRIPTION

This circuit provides power for main body ECU (driver side junction block assembly) operation.

WIRING DIAGRAM


PROCEDURE

1.

CHECK DRIVER SIDE JUNCTION BLOCK ASSEMBLY (MAIN BODY ECU (POWER SOURCE))

(a) Disconnect the 2C driver side junction block assembly connector.


(b) Measure the voltage according to the value(s) in the table below.

Standard Voltage:

Tester Connection

Condition

Specified Condition

2C-24 - Body ground

Always

11 to 14 V

2C-30 - Body ground

Always

11 to 14 V

Text in Illustration

*1

Front view of wire harness connector

(to Main Body ECU (Driver Side Junction Block Assembly))


NG

REPAIR OR REPLACE HARNESS OR CONNECTOR


OK

2.

CHECK HARNESS AND CONNECTOR (DRIVER SIDE JUNCTION BLOCK ASSEMBLY - BODY GROUND)

(a) Disconnect the 2F main body ECU (driver side junction block assembly) connectors.


(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

2F-16 - Body ground

Always

Below 1 Ω

Text in Illustration

*1

Front view of wire harness connector

(to Main Body ECU (Driver Side Junction Block Assembly))


OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE


NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

Security Indicator Light Circuit
DESCRIPTION Even when the theft deterrent system is in the disarmed state, the security indicator blinks due to a signal output from the immobiliser system. The security indicator blinks continuo ...

Unlock Warning Switch Circuit
DESCRIPTION The key unlock warning switch assembly turns on when the ignition key is inserted into the ignition key cylinder and turns off when the ignition key is removed. The main body ECU (driv ...

Other materials about Toyota Venza:

Vehicle Speed Sensor Malfunction (P0500)
DESCRIPTION The vehicle speed sensors detect the wheel speed and send the appropriate signals to the skid control ECU. The skid control ECU converts these wheel speed signals into a 4-pulse signal and outputs it to the ECM via the combination meter assemb ...

Installation
INSTALLATION PROCEDURE 1. INSTALL STARTER ASSEMBLY (a) Install the starter with the 2 bolts. Torque: 37 N·m {377 kgf·cm, 27 ft·lbf} (b) Connect the starter connector. ...

On-vehicle Inspection
ON-VEHICLE INSPECTION PROCEDURE 1. INSPECT HOOD SUB-ASSEMBLY (a) Check that the clearance measurements of areas *1 through *4 are within each standard range. Standard Clearance Area Measurement Area Measureme ...

© 2016-2025 Copyright www.tovenza.com

0.1467