ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY
(a) Connect the Techstream to the DLC3.
(b) Start the engine and turn the Techstream on.
(c) Inspect the oil control valve (for intake camshaft).
(1) Enter the following menus: Powertrain / Engine / Active Test / Control the VVT System (Bank 1).
(2) Check the engine speed when the oil control valve is operated using the Techstream with the engine coolant temperature at 50°C (122°F) or less.
HINT:
Standard Condition:
|
Tester Operation |
Specified Condition |
|---|---|
|
OCV is OFF |
Normal engine speed |
|
OCV is ON |
Soon after OCV switched from OFF to ON, engine idles roughly or stalls |
(d) Inspect the oil control valve (for exhaust camshaft).
(1) Enter the following menus: Powertrain / Engine / Active Test / Control the VVT Exhaust Linear (Bank 1).
(2) Check the engine speed when the oil control valve is operated using the Techstream with the engine coolant temperature at 50°C (122°F) or less.
HINT:
Standard Condition:
|
Tester Operation |
Specified Condition |
|---|---|
|
100% |
Soon after OCV switched from OFF (-100%) to ON (+100%), engine idles roughly or stalls. |
|
-100% |
Normal engine speed |
Components
RemovalData List / Active Test
DATA LIST / ACTIVE TEST
1. USING TECHSTREAM
(a) Connect the Techstream to the DLC3.
(b) Monitor the ECU data by following the prompts on the Techstream screen.
HINT:
The Techstream has a "Snapshot" function which records the monitored data. Refe ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
(a) Install the vacuum switching valve assembly (for ACIS) with the bolt.
Torque:
9.0 N·m {92 kgf·cm, 80 in·lbf}
...
Installation
INSTALLATION
PROCEDURE
1. INSTALL FRONT SUSPENSION MEMBER BODY MOUNTING REAR CUSHION LH
(a) Temporarily install a new front suspension member body mounting rear
cushion LH while confirming the installation direction.
NOTICE:
Position th ...