INSTALLATION
PROCEDURE
1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
(a) Install the vacuum switching valve assembly (for ACIS) with the bolt. Torque: 9.0 N·m {92 kgf·cm, 80 in·lbf} |
|
(b) Connect the 2 vacuum hoses, clamp and connector.
2. INSTALL OUTER COWL TOP PANEL
3. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY
4. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY
5. INSTALL FRONT FENDER TO COWL SIDE SEAL LH
6. INSTALL FRONT FENDER TO COWL SIDE SEAL RH
7. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH
8. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH
9. INSTALL FRONT WIPER ARM HEAD CAP
10. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
Operation Check
OPERATION CHECK
1. AUTOMATIC LIGHT CONTROL SYSTEM OPERATION CHECK
(a) Turn the ignition switch to ON.
(b) Turn the light control switch to the AUTO position.
(c) Cover the automatic light control sensor.
(d) Check that the taillights and low beam headligh ...
System Description
SYSTEM DESCRIPTION
1. GENERAL
(a) The air conditioning system has the following controls.
Control
Outline
Neural Network Control
This control is capable of performing complex control by artificially
simu ...
Dtc Check / Clear
DTC CHECK / CLEAR
1. CHECK DTC
(a) Connect the Techstream to the DLC3.
(b) Turn the engine switch on (IG).
(c) Read the DTC by following the prompts on the Techstream screen.
HINT:
Refer to the Techstream operator's manual for further details.
2. CL ...