ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY
(a) Connect the Techstream to the DLC3.
(b) Start the engine and turn the Techstream on.
(c) Inspect the oil control valve (for intake camshaft).
(1) Enter the following menus: Powertrain / Engine / Active Test / Control the VVT System (Bank 1).
(2) Check the engine speed when the oil control valve is operated using the Techstream with the engine coolant temperature at 50°C (122°F) or less.
HINT:
Standard Condition:
|
Tester Operation |
Specified Condition |
|---|---|
|
OCV is OFF |
Normal engine speed |
|
OCV is ON |
Soon after OCV switched from OFF to ON, engine idles roughly or stalls |
(d) Inspect the oil control valve (for exhaust camshaft).
(1) Enter the following menus: Powertrain / Engine / Active Test / Control the VVT Exhaust Linear (Bank 1).
(2) Check the engine speed when the oil control valve is operated using the Techstream with the engine coolant temperature at 50°C (122°F) or less.
HINT:
Standard Condition:
|
Tester Operation |
Specified Condition |
|---|---|
|
100% |
Soon after OCV switched from OFF (-100%) to ON (+100%), engine idles roughly or stalls. |
|
-100% |
Normal engine speed |
Components
RemovalInstallation
INSTALLATION
PROCEDURE
1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side)
(a) Apply a light coat of engine oil to a new O-ring, and install it
to the oil control valve.
Text in Illustration
*1
...
Terminals Of Ecm
TERMINALS OF ECM
1. CHECK ECM
Terminal No. (Symbol)
Wiring Color
Terminal Description
Condition
Specified Condition
A49-7 (TC) - B58-104 (E1)
V - BR
Terminal TC o ...
Operation Check
OPERATION CHECK
1. CHECK BASIC OPERATION
(a) Conditions necessary for the power back door to open:
The power back door main switch is off (switch is not pressed).
The back door is unlocked (except wireless operation).
The vehicle speed is 3 k ...