DESCRIPTION
WIRING DIAGRAM
Refer to "Cruise Main Indicator Light Circuit" (See page
).
PROCEDURE
|
1. |
PERFORM ACTIVE TEST USING TECHSTREAM |
(a) Connect the Techstream to the DLC3.
(b) Turn the ignition switch to ON.
(c) Turn the Techstream on.
(d) Enter the following menus: Body Electrical / Combination Meter / Active Test.
(e) Check the SET indicator light by performing the Active Test.
Combination Meter|
Tester Display |
Test Part |
Control Range |
Diagnostic Note |
|---|---|---|---|
|
Indicat. SET |
SET indicator light |
OFF or BLINK |
Confirm that the vehicle is stopped with the engine idling |
OK:
The SET indicator light blinks or goes off according to Techstream operation.
| NG | |
REPLACE COMBINATION METER ASSEMBLY |
|
|
2. |
READ VALUE USING TECHSTREAM |
(a) Connect the Techstream to the DLC3.
(b) Turn the ignition switch to ON.
(c) Turn the Techstream on.
(d) Enter the following menus: Powertrain / Cruise Control / Data List.
(e) According to the display on tester, read the Data List.
Cruise control (ECM)|
Tester Display |
Measurement Item/Range |
Normal Condition |
Diagnostic Note |
|---|---|---|---|
|
SET/COAST Switch |
- / SET switch signal / ON or OFF |
ON: - / SET switch ON OFF: - / SET switch off |
- |
OK:
The display changes as shown above according to cruise control main switch operation.
|
Result |
Proceed to |
|---|---|
|
OK |
A |
|
NG (for 1AR-FE) |
B |
|
NG (for 2GR-FE) |
C |
| A | |
USE SIMULATION METHOD TO CHECK |
| B | |
REPLACE ECM |
| C | |
REPLACE ECM |
Cruise Main Indicator Light Circuit
TC and CG Terminal CircuitInstallation
INSTALLATION
PROCEDURE
1. INSTALL THERMOSTAT
(a) Install a new gasket to the thermostat.
(b) Install the thermostat with the jiggle valve facing upward.
HINT:
The jiggle valve may be set to within 10° on either side of the prescribed
...
Reverse Signal Circuit
DESCRIPTION
The radio and display receiver assembly receives a reverse signal from the park/neutral
position switch assembly.
WIRING DIAGRAM
PROCEDURE
1.
CHECK BACK-UP LIGHT
(a) Move the shift lever to R and check if th ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
(a) Measure the resistance according to the value(s) in the table below.
Text in Illustration
*1
Body Ground
Stan ...