DESCRIPTION
WIRING DIAGRAM
Refer to "Cruise Main Indicator Light Circuit" (See page
).
PROCEDURE
|
1. |
PERFORM ACTIVE TEST USING TECHSTREAM |
(a) Connect the Techstream to the DLC3.
(b) Turn the ignition switch to ON.
(c) Turn the Techstream on.
(d) Enter the following menus: Body Electrical / Combination Meter / Active Test.
(e) Check the SET indicator light by performing the Active Test.
Combination Meter|
Tester Display |
Test Part |
Control Range |
Diagnostic Note |
|---|---|---|---|
|
Indicat. SET |
SET indicator light |
OFF or BLINK |
Confirm that the vehicle is stopped with the engine idling |
OK:
The SET indicator light blinks or goes off according to Techstream operation.
| NG | |
REPLACE COMBINATION METER ASSEMBLY |
|
|
2. |
READ VALUE USING TECHSTREAM |
(a) Connect the Techstream to the DLC3.
(b) Turn the ignition switch to ON.
(c) Turn the Techstream on.
(d) Enter the following menus: Powertrain / Cruise Control / Data List.
(e) According to the display on tester, read the Data List.
Cruise control (ECM)|
Tester Display |
Measurement Item/Range |
Normal Condition |
Diagnostic Note |
|---|---|---|---|
|
SET/COAST Switch |
- / SET switch signal / ON or OFF |
ON: - / SET switch ON OFF: - / SET switch off |
- |
OK:
The display changes as shown above according to cruise control main switch operation.
|
Result |
Proceed to |
|---|---|
|
OK |
A |
|
NG (for 1AR-FE) |
B |
|
NG (for 2GR-FE) |
C |
| A | |
USE SIMULATION METHOD TO CHECK |
| B | |
REPLACE ECM |
| C | |
REPLACE ECM |
Cruise Main Indicator Light Circuit
TC and CG Terminal CircuitShort in Front Pretensioner Squib LH Circuit (B1905/74-B1908/74)
DESCRIPTION
The front pretensioner squib LH circuit consists of the center airbag sensor
assembly and front seat outer belt assembly LH.
The center airbag sensor assembly uses this circuit to deploy the seat belt pretensioner
when deployment conditions a ...
Vsc Off Switch
Components
COMPONENTS
ILLUSTRATION
Removal
REMOVAL
PROCEDURE
1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable
is reconnected (See page ).
2. REMOVE FR ...
VC Output Circuit
DESCRIPTION
The ECM constantly generates 5 V of power from battery voltage supplied to the
+B (BATT) terminal to operate the microprocessor. The ECM also provides this power
to the sensors through the VC output circuit.
When the VC circuit is short-cir ...