On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT RR DEF RELAY
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
If the result is not as specified, replace the DEF relay. |
|
2. INSPECT DEICER RELAY
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
If the result is not as specified, replace the DEICER relay. |
|
Engine Stall History (P1603,P1605)
DESCRIPTION
P1603
After starting the engine, this DTC is stored when the engine stops without the
ignition switch being operated.
Using the Techstream, the conditions present when the DTC was stored can be confirmed
by referring to the freeze frame data ...
IG2 Signal Malfunction (B2788)
DESCRIPTION
The steering lock ECU (steering lock actuator assembly) receives power from the
IG2 relay. When the voltage value indicated by the IG signal from the certification
ECU (smart key ECU assembly) equals to the voltage that is applied to the steer ...
Calculation formula for your vehicle
1. Cargo capacity
2. Total load capacity (vehicle capacity weight)
When 2 people with the combined weight of A lb. (kg) are riding in your vehicle,
which has a total load capacity (vehicle capacity weight) of B lb. (kg), the available
amount of cargo a ...