PROCEDURE
|
1. |
CHECK LOOSENESS OF V-RIBBED BELT |
(a) Check the tension of the belt by pushing it down with a finger.
OK:
The tension of the belt is enough.
| NG | |
ADJUST V-RIBBED BELT |
|
|
2. |
CHECK V-RIBBED BELT FOR WEAR |
(a) Check the V-ribbed belt for wear.
OK:
The V-ribbed belt is not worn.
| NG | |
REPLACE V-RIBBED BELT |
|
|
3. |
CHECK GENERATOR CLUTCH PULLEY FOR WEAR |
(a) Check the clutch pulley grooves for wear or other defects.
OK:
The clutch pulley grooves are not damaged.
| NG | |
REPLACE GENERATOR CLUTCH PULLEY |
|
|
4. |
CHECK FOR NOISE WHILE GENERATOR CLUTCH PULLEY IS OPERATING |
(a) Perform a road test and check if noise occurs when decelerating.
OK:
Noise does not occur.
| OK | |
REPLACE GENERATOR ASSEMBLY |
| NG | |
REPLACE GENERATOR CLUTCH PULLEY |
On-vehicle Inspection
GeneratorReassembly
REASSEMBLY
PROCEDURE
1. INSTALL NO. 1 CENTER SUPPORT BEARING ASSEMBLY
(a) Set the No. 1 center support bearing on the intermediate shaft as
shown in the illustration.
NOTICE:
Make sure to install the bearing in the correct position.
...
Data List / Active Test
DATA LIST / ACTIVE TEST
1. DATA LIST
HINT:
Using the Techstream to read the Data List allows the values or states of switches,
sensors, actuators and other items to be read without removing any parts. This non-intrusive
inspection can be very useful bec ...
Precaution
PRECAUTION
1. WHEN DISCONNECTING CABLE FROM NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable from the negative (-) battery terminal, initialize
the following systems after the cable is reconnected.
System Name
See Proc ...