Installation
ComponentsInstallation
INSTALLATION
PROCEDURE
1. INSTALL STUD BOLT (for LH Side)
(a) Install the stud bolt.
Torque:
17 N·m {173 kgf·cm, 13 ft·lbf}
2. INSTALL STUD BOLT (for RH Side)
HINT:
Perform the same proc ...
Glove Box Light
Components
COMPONENTS
ILLUSTRATION
Inspection
INSPECTION
PROCEDURE
1. INSPECT GLOVE BOX LIGHT ASSEMBLY
(a) Connect a positive (+) lead from the battery to terminal 1 and a
negative (-) lead to terminal 2.
...
Dtc Check / Clear
DTC CHECK / CLEAR
1. CHECK FOR TRANSPONDER KEY ECU DTC
(a) Connect the Techstream to the DLC3.
(b) Turn the ignition switch to ON.
(c) Turn the Techstream on.
(d) Enter the following menus: Body Electrical / Immobiliser / Trouble Codes.
(e) Check the det ...