INSTALLATION
PROCEDURE
1. INSTALL CONSOLE BOX ASSEMBLY
|
(a) Connect the connectors. |
|
(b) Engage the 2 claws.
|
(c) Install the screw and 2 clips. |
|
|
(d) Install the console box assembly with the 2 bolts. |
|
2. INSTALL NO. 2 CONSOLE BOX CARPET
|
(a) Install the No. 2 console box carpet. |
|
3. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY (w/o Seat Heater System)
4. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY (w/ Seat Heater System)
Removal
ReassemblyComponents
COMPONENTS
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
...
Installation
INSTALLATION
PROCEDURE
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator with the 2 bolts.
Torque:
52 N·m {530 kgf·cm, 38 ft·lbf}
(b) Install the wire harness clamp bracke ...
Precaution
PRECAUTION
NOTICE:
When disconnecting the cable from the negative (-) battery terminal, initialize
the following systems after the cable is reconnected.
System Name
See Procedure
Back Door Closer System
...