INSPECTION
PROCEDURE
1. INSPECT FRONT SHOCK ABSORBER ASSEMBLY
|
(a) Compress and extend the shock absorber rod 4 or more times. Standard: There is no abnormal resistance or sound and operation resistance is normal. HINT: If there is any abnormality, replace the front shock absorber with a new one. |
|
Removal
DisposalInspection
INSPECTION
PROCEDURE
1. INSPECT FRONT POWER SEAT SWITCH LH (w/o Seat Position Memory System)
(a) Measure the resistance between the terminals when each switch is
operated.
Standard Resistance:
Slide Switch
Tester Co ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL NO. 1 FUEL TANK CUSHION
(a) Install 8 new No. 1 fuel tank cushions to the fuel tank.
2. INSTALL FUEL MAIN TUBE SUPPORT
(a) Install the fuel main tube su ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT PARKING BRAKE SWITCH ASSEMBLY
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Switch Condition
...