CAUTION / NOTICE / HINT
HINT:
PROCEDURE
1. |
VEHICLE BROUGHT TO WORKSHOP |
|
2. |
CUSTOMER PROBLEM ANALYSIS |
What |
Vehicle model, system name |
When |
Date, time, occurrence frequency |
Where |
Road conditions |
Under what conditions? |
Driving conditions, weather conditions |
How did it happen? |
Problem symptoms |
|
3. |
PRE-CHECK |
(a) Measure the battery voltage.
Standard Voltage:
11 to 14 V
If the voltage is below 11 V, recharge or replace the battery before proceeding to the next step.
(b) Check the fuses and relays.
(c) Check the connector connections and terminals to make sure that there are no abnormalities such as loose connections, deformation, etc.
|
4. |
INSPECT COMMUNICATION FUNCTION OF LIN COMMUNICATION SYSTEM* |
(a) Use the Techstream to check if the LIN communication system is functioning
normally (See page ).
Result |
Proceed to |
---|---|
No DTCs output |
A |
DTCs output |
B |
B | ![]() |
GO TO LIN COMMUNICATION SYSTEM |
|
5. |
CHECK FOR DTC* |
(a) Check for DTCs and note any codes that are output (See page
).
(b) Clear the DTCs.
(c) Recheck for DTCs.
Result |
Proceed to |
---|---|
No DTCs output |
A |
DTCs output |
B |
B | ![]() |
GO TO DIAGNOSTIC TROUBLE CODE CHART |
|
6. |
PROBLEM SYMPTOMS TABLE |
(a) Refer to Problem Symptoms Table (See page
).
Result |
Proceed to |
---|---|
Fault is not listed in problem symptoms table |
A |
Fault is listed in problem symptoms table |
B |
B | ![]() |
GO TO STEP 8 |
|
7. |
OVERALL ANALYSIS AND TROUBLESHOOTING* |
(a) Operation Check (See page )
(b) Data List / Active Test (See page )
(c) Terminals of ECU (See page )
|
8. |
REPAIR OR REPLACE |
|
9. |
INITIALIZE POWER WINDOW CONTROL SYSTEM |
(a) If any of the door window regulator sub-assemblies, power window regulator
motor assemblies, door glass or door glass runs have been removed and reinstalled,
perform "Initialize Power Window Control System" for the applicable door glass (See
page ).
|
10. |
CONFIRMATION TEST |
NEXT | ![]() |
END |
Installation
INSTALLATION
CAUTION / NOTICE / HINT
HINT:
Use the same procedure for the RH side and LH side.
The procedure listed below is for the LH side.
PROCEDURE
1. INSTALL REAR AXLE HUB AND BEARING ASSEMBLY
(a) Apply a total of 0.1 to 0.3g (0.00 ...
Freeze Frame Data
FREEZE FRAME DATA
1. FREEZE FRAME DATA
NOTICE:
Freeze frame data values will vary depending on the measurement conditions,
surroundings, or vehicle conditions. For this reason, there may be a problem
even when the values are within specifica ...
Precaution
PRECAUTION
1. PRECAUTION FOR DISCONNECTING CABLE FROM NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable from the negative (-) battery terminal, initialize
the following system after the terminal is reconnected:
System Name
...