Toyota Venza manuals

Toyota Venza: Hood

Installation
INSTALLATION PROCEDURE 1. INSTALL FUEL LID LOCK CONTROL CABLE SUB-ASSEMBLY (a) Engage the 8 clamps. (b) Engage the 2 claws and connect the fuel lid lock control cable sub-assembly. ...

Disassembly
DISASSEMBLY PROCEDURE 1. REMOVE HOOD TO RADIATOR SUPPORT SEAL (a) Using a clip remover, disengage the 10 clips and remove the hood to radiator support seal. ...

Other materials about Toyota Venza:

Installation
INSTALLATION PROCEDURE 1. INSTALL REAR SEAT ASSEMBLY RH (a) Place the rear seat assembly RH in the cabin. NOTICE: Be careful not to damage the vehicle body. (b) Temporarily install the 2 bolts on the front side of the seat. ...

Installation
INSTALLATION PROCEDURE 1. INSTALL POWER BACK DOOR UNIT ASSEMBLY (a) Install the power back door unit with the 4 bolts. Torque: 13 N·m {133 kgf·cm, 10 ft·lbf} (b) Connect the connector. 2. ...

Front Brake Flexible Hose
Components COMPONENTS ILLUSTRATION Installation INSTALLATION CAUTION / NOTICE / HINT NOTICE: Because the left and right hoses are not interchangeable, verify the part number when installing the flexible hoses. If the hoses are to b ...

© 2016-2026 Copyright www.tovenza.com

0.1185