Toyota Venza manuals

Toyota Venza: Initialization

INITIALIZATION

1. RESET BACK DOOR CLOSE POSITION

NOTICE:

Perform initialization of the power back door system (power back door ECU initialization) if one of the following is performed:

  1. The cable is disconnected from the negative (-) battery terminal.
  2. A wire harness of the power back door system is disconnected and reconnected.
  3. The power back door ECU (back door motor unit) is replaced or removed and reinstalled.
  4. The ECU-B fuse is replaced or removed and reinstalled.

If initialization is not performed, the power back door system will not operate.

(a) When the back door is open and the cable is disconnected and reconnected to the negative (-) battery terminal, fully close the back door by hand to initialize the power back door system.

HINT:

  • Initialization is not necessary if the cable is disconnected and reconnected to the negative (-) battery terminal while the back door is closed.
  • The power back door ECU controls the locked or unlocked state of the back door based on its memory. If the power for the power back door ECU is disconnected and reconnected, the back door will need to be unlocked before it can be operated.
  • If the power back door system does not operate and/or the back door does not open, disconnect the cable from the negative (-) battery terminal. Then wait 10 seconds, reconnect the cable and perform initialization of the power back door system again.
Operation Check
OPERATION CHECK 1. CHECK BASIC OPERATION (a) Conditions necessary for the power back door to open: The power back door main switch is off (switch is not pressed). The back door is unlock ...

Problem Symptoms Table
PROBLEM SYMPTOMS TABLE Use the table below to help determine the cause of problem symptoms. If multiple suspected areas are listed, the potential causes of the symptoms are listed in o ...

Other materials about Toyota Venza:

Installation
INSTALLATION PROCEDURE 1. INSTALL BRAKE ACTUATOR ASSEMBLY (a) Install the brake actuator assembly to the brake actuator bracket assembly with the 2 nuts. Torque: 8.0 N·m {82 kgf·cm, 71 in·lbf} NOTICE: Do not remov ...

Inspection
INSPECTION PROCEDURE 1. INSPECT PRELOAD (a) Using SST and a torque wrench, measure the preload of the backlash between the driven pinion and ring gear. SST: 09326-20011 Preload (at Starting): Item P ...

Problem Symptoms Table
PROBLEM SYMPTOMS TABLE HINT: Use the table below to help determine the cause of problem symptoms. If multiple suspected areas are listed, the potential causes of the symptoms are listed in order of probability in the "Suspected Area" ...

© 2016-2024 Copyright www.tovenza.com

0.1514