REASSEMBLY
PROCEDURE
1. INSTALL NO. 1 INSTRUMENT PANEL PIN
|
(a) Install the 2 No. 1 instrument panel pins with the 2 screws <E> or <F>. |
|
2. INSTALL GLOVE BOX LIGHT ASSEMBLY
|
(a) Engage the 2 claws to install the glove box light assembly. |
|
3. INSTALL FRONT PASSENGER AIRBAG ASSEMBLY
4. INSTALL NO. 3 INSTRUMENT PANEL WIRE
|
(a) Engage the 4 clamps to install the No. 3 instrument panel wire. |
|
5. INSTALL NAVIGATION ANTENNA ASSEMBLY (w/ Navigation System)
6. INSTALL NO. 1 ANTENNA CORD SUB-ASSEMBLY
7. INSTALL HEATER TO REGISTER DUCT
(a) Install the heater to register duct with the 7 screws <E> or <F>.
8. INSTALL DEFROSTER NOZZLE ASSEMBLY
|
(a) Install the defroster nozzle assembly with the 4 screws <E> or <F>. |
|
9. INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT
|
(a) Install the No. 2 side defroster nozzle duct with the 2 screws <E> or <F>. |
|
10. INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT
|
(a) Install the No. 1 side defroster nozzle duct with the 2 screws <E> or <F>. |
|
Disassembly
InstallationEvaporative Emission Control System Incorrect Purge Flow (P0441)
DTC SUMMARY
DTC No.
Monitoring Item
Malfunction Detection Condition
Trouble Area
Detection Timing
Detection Logic
P0441
Purge VSV (Vacuum Switching Valve) stuck open ...
Terminals Of Ecu
TERMINALS OF ECU
1. CHECK POSITION CONTROL ECU AND SWITCH ASSEMBLY
(a) Disconnect the T10 and T11 position control ECU and switch assembly connectors.
(b) Measure the voltage and resistance according to the value(s) in the table
below.
HINT:
Measure t ...
Back-up Power Source Circuit
DESCRIPTION
The back-up power source circuit for the A/C amplifier is shown below. Power
is supplied even when the ignition switch is turned off. The power is used for diagnostic
trouble code memory, etc.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
NOTICE ...