CAUTION / NOTICE / HINT
HINT:
PROCEDURE
|
1. |
VEHICLE BROUGHT TO WORKSHOP |
|
|
2. |
CUSTOMER PROBLEM ANALYSIS |
HINT:
|
What |
Vehicle model, system name |
|
When |
Date, time, occurrence frequency |
|
Where |
Road conditions |
|
Under what conditions? |
Running conditions, driving conditions, weather conditions |
|
How did it happen? |
Problem symptoms |
|
|
3. |
INSPECT BATTERY VOLTAGE |
Standard Voltage:
11 to 14 V
If the voltage is below 11 V, recharge or replace the battery before proceeding to the next step.
|
|
4. |
CHECK COMMUNICATION FUNCTION OF CAN COMMUNICATION SYSTEM* |
(a) Use the Techstream to check if the CAN communication system is functioning normally.
|
Result |
Proceed to |
|---|---|
|
CAN DTC is not output |
A |
|
CAN DTC is output |
B |
| B | |
GO TO CAN COMMUNICATION SYSTEM |
|
|
5. |
CHECK FOR DTC* |
(a) Check for DTCs (See page
).
(b) Clear the DTCs (See page
).
(c) Recheck for DTCs (See page
).
|
Result |
Proceed to |
|---|---|
|
DTC is not output |
A |
|
DTC is output |
B |
| B | |
GO TO DIAGNOSTIC TROUBLE CODE CHART |
|
|
6. |
PROBLEM SYMPTOMS TABLE |
(a) Refer to Problem Symptoms Table (See page
).
|
Result |
Proceed to |
|---|---|
|
Fault is not listed in Problem Symptoms Table |
A |
|
Fault is listed in Problem Symptoms Table |
B |
| B | |
GO TO STEP 8 |
|
|
7. |
OVERALL ANALYSIS AND TROUBLESHOOTING* |
(a) Operation check (See page
)
(b) Terminals of ECU (See page
)
(c) Data List / Active Test (See page
)
|
|
8. |
ADJUST, REPAIR OR REPLACE |
|
|
9. |
CONFIRMATION TEST |
| NEXT | |
END |
System Diagram
Customize ParametersData List / Active Test
DATA LIST / ACTIVE TEST
1. DATA LIST
HINT:
Using the Techstream to read the Data List allows the values or states of switches,
sensors, actuator and other items to be read without removing any parts. This non-intrusive
inspection can be very useful beca ...
Relay
On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT IG2 RELAY
(a) Remove the IG2 relay from the relay block.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Te ...
Removal
REMOVAL
PROCEDURE
1. REMOVE AIR CONDITIONING UNIT ASSEMBLY
(See page )
2. REMOVE NO. 1 FINISH PANEL MOUNTING BRACKET
3. REMOVE NO. 2 FINISH PANEL MOUNTING BRACKET
4. REMOVE NO. 3 AIR DUCT SUB-ASSEMBLY
5. REMOVE NO. 2 AIR DUCT SUB-ASSEMBLY
...