DESCRIPTION
The headlight leveling ECU assembly outputs DTC information to the Techstream via this circuit.
WIRING DIAGRAM
PROCEDURE
|
1. |
CHECK HARNESS AND CONNECTOR (DLC3 - HEADLIGHT LEVELING ECU ASSEMBLY) |
(a) Disconnect the A40 headlight leveling ECU assembly connector.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
|
Tester Connection |
Condition |
Specified Condition |
|---|---|---|
|
A40-15 (PRST) - D1-7 (SIL) |
Always |
Below 1 Ω |
|
A40-15 (PRST) - Body ground |
Always |
10 kΩ or higher |
| OK | |
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE |
| NG | |
REPAIR OR REPLACE HARNESS OR CONNECTOR |
LVL Terminal CircuitOn-vehicle Inspection
ON-VEHICLE INSPECTION
CAUTION / NOTICE / HINT
CAUTION:
Be sure to follow the correct removal and installation procedures of the driver
side knee airbag assembly.
PROCEDURE
1. INSPECT DRIVER SIDE KNEE AIRBAG ASSEMBLY (VEHICLE NOT INVOLVED IN COLLISION)
...
Reassembly
REASSEMBLY
PROCEDURE
1. INSTALL FRONT OIL PUMP OIL SEAL
(a) Using SST and a hammer, install a new oil seal to the oil pump body.
SST: 09350-32014
09351-32140
Oil seal driven in depth:
-0.25 to 0.25 mm (-0.00984 to 0.00984 in.)
...
Battery
- Battery exterior
Make sure that the battery terminals are not corroded and that there are no loose
connections, cracks, or loose clamps.
1. Terminals
2. Hold-down clamp
- Before recharging
When recharging, the battery produces hydrogen g ...