Toyota Venza manuals

Toyota Venza: Installation

INSTALLATION

CAUTION / NOTICE / HINT

NOTICE:

When disconnecting the steering intermediate shaft assembly and pinion shaft of the steering gear assembly, be sure to place matchmarks before servicing.

PROCEDURE

1. INSTALL TIE ROD ASSEMBLY LH

(a) Install the lock nut and tie rod assembly LH to the steering gear assembly until the matchmarks are aligned.

Text in Illustration

*1

Matchmark

HINT:

After adjusting toe-in, tighten the lock nut.


2. INSTALL TIE ROD ASSEMBLY RH

HINT:

Perform the same procedure as for the LH side.

3. INSTALL STEERING LINK ASSEMBLY

(a) Install the steering link assembly with the 2 bolts and 2 nuts.

Torque:

70 N·m {713 kgf·cm, 51 ft·lbf}

NOTICE:

  • Make sure to tighten the bolts starting from the left side of the vehicle.
  • Because the nut has its own stopper, do not turn the nut. Tighten the bolt with the nut secured.

4. INSTALL FRONT STABILIZER BAR WITH BRACKET

(a) Install the front stabilizer bar with bracket to the front frame assembly.

5. INSTALL FRONT NO. 1 STABILIZER BRACKET LH

(a) Install the front No. 1 stabilizer bracket LH with the 2 bolts.

Torque:

29 N·m {296 kgf·cm, 21 ft·lbf}


6. INSTALL FRONT NO. 1 STABILIZER BRACKET RH

HINT:

Perform the same procedure as for the LH side.

7. INSTALL FRONT FLOOR BRACE


8. INSTALL FRONT STABILIZER LINK ASSEMBLY LH


9. INSTALL FRONT STABILIZER LINK ASSEMBLY RH

HINT:

Perform the same procedure as for the LH side.

10. CONNECT TIE ROD ASSEMBLY LH

(a) Connect the tie rod assembly LH to the steering knuckle with the nut.

Torque:

49 N·m {500 kgf·cm, 36 ft·lbf}


(b) Install a new cotter pin.

NOTICE:

Further tighten the nut up to 60° if the holes for the cotter pin are not aligned.

11. CONNECT TIE ROD ASSEMBLY RH

HINT:

Perform the same procedure as for the LH side.

12. CONNECT STEERING INTERMEDIATE SHAFT ASSEMBLY

(a) Align the matchmarks on the steering intermediate shaft assembly and steering link assembly.

Text in Illustration

*1

Matchmark


(b) Install the bolt.

Torque:

35 N·m {357 kgf·cm, 26 ft·lbf}


13. INSTALL FRONT WHEELS

Torque:

103 N·m {1050 kgf·cm, 76 ft·lbf}

14. PLACE FRONT WHEELS FACING STRAIGHT AHEAD

15. INSTALL NO. 1 ENGINE UNDER COVER

16. INSTALL NO. 2 ENGINE UNDER COVER

17. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT

(See page )


Reassembly
REASSEMBLY PROCEDURE 1. INSTALL NO. 2 STEERING RACK BOOT (a) Apply lithium soap base glycol grease to the inside of the small opening of a new No. 2 steering rack boot. ...

Steering Gear(for 2gr-fe 2wd)
...

Other materials about Toyota Venza:

Installation
INSTALLATION PROCEDURE 1. INSTALL NO. 1 ULTRASONIC SENSOR RETAINER (a) Engage the 2 claws to install the No. 1 ultrasonic sensor retainer to the rear bumper assembly. Text in Illustration *A LH Side ...

Cooling System
On-vehicle Inspection ON-VEHICLE INSPECTION PROCEDURE 1. INSPECT FOR COOLANT LEAK CAUTION: Do not remove the radiator cap while the engine and radiator are still hot. Pressurized hot engine coolant and steam may be released and cause serious burns. N ...

Removal
REMOVAL PROCEDURE 1. REMOVE REAR DOOR SCUFF PLATE 2. DISCONNECT REAR DOOR OPENING TRIM WEATHERSTRIP (a) Remove the rear part of the rear door opening trim weatherstrip to the extent that allows removal of the deck trim side panel assembly ...

© 2016-2024 Copyright www.tovenza.com

0.136