Toyota Venza manuals

Toyota Venza: Removal

REMOVAL

PROCEDURE

1. REMOVE FRONT WIPER ARM HEAD CAP


2. REMOVE FRONT WIPER ARM AND BLADE ASSEMBLY LH


3. REMOVE FRONT WIPER ARM AND BLADE ASSEMBLY RH


4. REMOVE FRONT FENDER TO COWL SIDE SEAL LH


5. REMOVE FRONT FENDER TO COWL SIDE SEAL RH


6. REMOVE COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY


7. REMOVE WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY


8. REMOVE OUTER COWL TOP PANEL


9. REMOVE NO. 1 ENGINE COVER SUB-ASSEMBLY


10. REMOVE VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)

(a) Disconnect the 2 vacuum hoses, clamp and connector.


(b) Remove the bolt and vacuum switching valve assembly (for ACIS).

Inspection
INSPECTION PROCEDURE 1. INSPECT VACUUM SWITCHING VALVE ASSEMBLY (for ACIS) (a) Measure the resistance according to the value(s) in the table below. Text in Illustration ...

Installation
INSTALLATION PROCEDURE 1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for ACIS) (a) Install the vacuum switching valve assembly (for ACIS) with the bolt. Torque: 9.0 N·m {92 kgf·cm ...

Other materials about Toyota Venza:

Towing with a wheel lift-type truck
►From the front (2WD models) Release the parking brake. ►From the front (AWD models) Use a towing dolly under the rear wheels. ► From the rear Use a towing dolly under the front wheels. ...

Removal
REMOVAL PROCEDURE 1. REMOVE INSTRUMENT PANEL REINFORCEMENT ASSEMBLY WITH AIR CONDITIONING UNIT (See page ) 2. REMOVE COOL AIR INTAKE DUCT SEAL 3. REMOVE INLET NO. 2 AIR CLEANER 4. REMOVE AIR CLEANER CAP WITH HOSE 5. REMOVE AIR CLEANER CASE ...

Installation
INSTALLATION PROCEDURE 1. INSTALL FUEL PRESSURE REGULATOR ASSEMBLY (a) Apply a light coat of gasoline to 2 new O-rings, and install them onto the fuel pressure regulator. Text in Illustration *1 New O-r ...

© 2016-2024 Copyright www.tovenza.com

0.1299