INSTALLATION
PROCEDURE
1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Move the shift lever to N.
|
(b) Align the protrusions of the park/neutral position switch. Text in Illustration
|
|
|
(c) Install the park/neutral position switch to the control shaft with the 2 bolts. Torque: 5.4 N·m {55 kgf·cm, 48 in·lbf} NOTICE:
|
|
|
(d) Install the transmission control shaft lever to the control shaft with the nut and washer. Torque: 13 N·m {130 kgf·cm, 9 ft·lbf} |
|
(e) Connect the connector to the park/neutral position switch.
|
(f) Connect the transmission control cable to the transmission control cable bracket with a new clip. |
|
(g) Connect the transmission control cable to the transmission control shaft lever with the nut.
Torque:
13 N·m {130 kgf·cm, 9 ft·lbf}
2. INSTALL AIR CLEANER BRACKET
|
(a) Install the air cleaner bracket with the 3 bolts. Torque: 7.8 N·m {80 kgf·cm, 69 in·lbf} |
|
(b) Install the wire harness clamp.
3. INSTALL AIR CLEANER CASE
4. INSTALL AIR CLEANER CAP WITH HOSE
5. INSTALL INLET NO. 2 AIR CLEANER
6. INSTALL COOL AIR INTAKE DUCT SEAL
7. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION
8. INSPECT SHIFT LEVER POSITION
9. ADJUST SHIFT LEVER POSITION
Adjustment
Shift LeverIntake Air Control Valve Actuator(for Tcv)
Components
COMPONENTS
ILLUSTRATION
Removal
REMOVAL
PROCEDURE
1. REMOVE INTAKE MANIFOLD
(a) Remove the intake manifold (See page ).
2. REMOVE INTAKE AIR CONTROL VALVE ACTUATOR (for TCV)
(a) Remove the 2 bolts, intake air control valve actuator a ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT BRAKE DISC INSIDE DIAMETER
(a) Using a brake drum gauge or an equivalent tool, measure the inside
diameter of the disc.
Standard inside diameter of a new disc:
190 mm (7.48 in.)
Maximum inside diamete ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT FRONT OIL PUMP AND GEAR BODY SUB-ASSEMBLY
(a) Turn the drive gear with 2 screwdrivers and make sure that it rotates
smoothly.
NOTICE:
Be careful not to damage the oil seal lip.
...