INSTALLATION
PROCEDURE
1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Move the shift lever to N.
|
(b) Align the protrusions of the park/neutral position switch. Text in Illustration
|
|
|
(c) Install the park/neutral position switch to the control shaft with the 2 bolts. Torque: 5.4 N·m {55 kgf·cm, 48 in·lbf} NOTICE:
|
|
|
(d) Install the transmission control shaft lever to the control shaft with the nut and washer. Torque: 13 N·m {130 kgf·cm, 9 ft·lbf} |
|
(e) Connect the connector to the park/neutral position switch.
|
(f) Connect the transmission control cable to the transmission control cable bracket with a new clip. |
|
(g) Connect the transmission control cable to the transmission control shaft lever with the nut.
Torque:
13 N·m {130 kgf·cm, 9 ft·lbf}
2. INSTALL AIR CLEANER BRACKET
|
(a) Install the air cleaner bracket with the 3 bolts. Torque: 7.8 N·m {80 kgf·cm, 69 in·lbf} |
|
(b) Install the wire harness clamp.
3. INSTALL AIR CLEANER CASE
4. INSTALL AIR CLEANER CAP WITH HOSE
5. INSTALL INLET NO. 2 AIR CLEANER
6. INSTALL COOL AIR INTAKE DUCT SEAL
7. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION
8. INSPECT SHIFT LEVER POSITION
9. ADJUST SHIFT LEVER POSITION
Adjustment
Shift LeverWinter driving tips
Carry out the necessary preparations and inspections before driving the vehicle
in winter. Always drive the vehicle in a manner appropriate to the prevailing weather
conditions.
- Pre-winter preparations
• Use fluids that are appropriate to the p ...
ABS Warning Light does not Come ON
DESCRIPTION
The skid control ECU is connected to the combination meter via CAN communication.
WIRING DIAGRAM
Refer to ABS Warning Light Remains ON (See page
).
PROCEDURE
1.
CHECK CAN COMMUNICATION SYSTEM
(a) Check if a C ...
Coolant
Replacement
REPLACEMENT
PROCEDURE
1. REMOVE NO. 1 ENGINE UNDER COVER
2. REMOVE NO. 2 ENGINE UNDER COVER
3. DRAIN ENGINE COOLANT
(a) Loosen the radiator drain cock plug and drain the coolant.
NOTICE:
Do not remove the reserve tank cap or radiator drai ...