INSTALLATION
PROCEDURE
1. INSTALL TRANSFER ASSEMBLY
(a) Install the transfer assembly to the transaxle assembly with 2 new bolts and the 6 nuts. Torque: 69 N·m {700 kgf·cm, 51 ft·lbf} NOTICE:
|
|
2. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY (for 2GR-FE)
3. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY (for 1AR-FE)
4. INSTALL FLEXIBLE HOSE BRACKET SUB-ASSEMBLY (for 2GR-FE)
5. INSTALL WIRE HARNESS (for 2GR-FE)
6. INSTALL WIRE HARNESS (for 1AR-FE)
7. INSTALL TRANSFER STIFFENER PLATE RH (for 2GR-FE)
8. INSTALL TRANSFER STIFFENER PLATE RH (for 1AR-FE)
9. INSTALL MANIFOLD STAY (for 2GR-FE)
10. INSTALL STARTER ASSEMBLY (for 2GR-FE)
11. INSTALL STARTER ASSEMBLY (for 1AR-FE)
12. INSTALL FRONT FRAME ASSEMBLY (for 2GR-FE)
13. INSTALL FRONT FRAME ASSEMBLY (for 1AR-FE)
14. INSTALL REAR ENGINE MOUNTING INSULATOR ASSEMBLY (for 1AR-FE)
15. INSTALL STEERING LINK ASSEMBLY
16. INSTALL FRONT STABILIZER BAR WITH FRONT STABILIZER LINK ASSEMBLY
17. INSTALL FRONT NO. 1 STABILIZER BRACKET LH
18. INSTALL FRONT NO. 1 STABILIZER BRACKET RH
HINT:
Perform the same procedure as for the LH side.
19. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE
See page for 2GR-FE
See page for 1AR-FE
Removal
REMOVAL
CAUTION / NOTICE / HINT
HINT:
Use the same procedure for the LH side and RH side.
The following procedure is for the LH side.
PROCEDURE
1. REMOVE ENGINE ASSEMBLY WITH TRANSAXLE (for 2GR-FE)
HINT:
Refer to the procedure up to Re ...
Components
COMPONENTS
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
...
Opening the fuel tank cap
Perform the following steps to open the fuel tank cap.
- Before refueling the vehicle
• Vehicles with smart key system
Turn the “ENGINE START STOP” switch off and ensure that all the doors and windows
are closed.
• Vehicles without smart ke ...