INSTALLATION
PROCEDURE
1. INSTALL BRAKE MASTER CYLINDER SUB-ASSEMBLY
NOTICE:
When install a new brake master cylinder sub-assembly, remove the protectors from the piston and outlet ports.
(a) Install a new O-ring to the brake master cylinder sub-assembly.
(b) Apply a light layer of lithium soap base glycol grease to the entire circumference of the brake master cylinder sub-assembly and inner surface of the brake booster assembly as shown in the illustration. |
|
(c) Install the brake master cylinder sub-assembly and front brake tube way with the 2 nuts. Torque: 13 N·m {130 kgf·cm, 9 ft·lbf} NOTICE:
|
|
(d) Using a union nut wrench, connect the 2 brake lines and install the No. 1 front brake tube to the brake master cylinder sub-assembly. Text in Illustration
Torque: Specified Tightening Torque : 20 N·m {199 kgf·cm, 14 ft·lbf} NOTICE:
HINT:
|
|
(e) Using a union nut wrench, connect the 2 brake lines to the front brake tube way. Text in Illustration
Torque: Specified Tightening Torque : 15 N·m {155 kgf·cm, 11 ft·lbf} NOTICE:
HINT:
|
|
(f) Connect the connector and engage the clamp. |
|
2. FILL RESERVOIR WITH BRAKE FLUID
3. BLEED BRAKE MASTER CYLINDER
4. BLEED BRAKE LINE
5. INSPECT FOR BRAKE FLUID LEAK
6. INSPECT FLUID LEVEL IN RESERVOIR
7. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
8. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (for 1AR-FE)
9. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (for 2GR-FE)
Components
COMPONENTS
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
...
Terminals Of Ecu
TERMINALS OF ECU
1. CHECK MAIN BODY ECU (DRIVER SIDE JUNCTION BLOCK ASSEMBLY)
(a) Disconnect the 2A, 2C and 2F main body ECU (driver side junction block assembly)
connectors.
(b) Measure the voltage and resistance according to the value(s) in the table ...
Rocker Panel Moulding
Components
COMPONENTS
ILLUSTRATION
Removal
REMOVAL
PROCEDURE
1. REMOVE FRONT FENDER OUTSIDE MOULDING
2. REMOVE NO. 2 ROCKER PANEL MOULDING PROTECTOR
3. REMOVE REAR ROCKER PANEL MOULDING END COVER
4. REMOVE BODY ROCKER PANEL MOULDING ASS ...