INSTALLATION
PROCEDURE
1. INSTALL GENERATOR ASSEMBLY
(a) Install the wire harness clamp with the bolt. Torque: 8.4 N·m {86 kgf·cm, 74 in·lbf} |
|
(b) Install the 2 bolts. Torque: 43 N·m {438 kgf·cm, 32 ft·lbf} |
|
(c) Install the generator bracket with the 2 bolts. Torque: 20 N·m {204 kgf·cm, 15 ft·lbf} |
|
(d) Connect the wire harness clamp.
(e) Connect the generator connector to the generator assembly. |
|
(f) Install the generator wire with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(g) Install the terminal cap.
(h) Connect the 2 wire harness clamps.
(i) Connect the magnetic clutch connector to the compressor and magnetic clutch.
2. INSTALL V-RIBBED BELT
HINT:
See page
3. INSTALL RADIATOR ASSEMBLY
HINT:
See page
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ).
Horn System
Precaution
PRECAUTION
NOTICE:
When disconnecting the cable from the negative (-) battery terminal, initialize
the following system after the cable is reconnected.
System Name
See Procedure
Back Door Closer System
...
Door Control Transmitter(w/ Smart Key System)
Components
COMPONENTS
ILLUSTRATION
Removal
REMOVAL
PROCEDURE
1. REMOVE TRANSMITTER BATTERY
Inspection
INSPECTION
PROCEDURE
1. INSPECT DOOR CONTROL TRANSMITTER
(a) Inspect operation of the transmitter.
(1) Remove the battery (lithium batt ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL STEREO COMPONENT TUNER ASSEMBLY
2. INSTALL NAVIGATION WIRE
(a) Connect the 3 connectors to install the navigation wire.
3. INSTALL STEREO COMPONENT TUNER ASSEMBLY WITH WIRE
(a) Install the stereo component tuner assembly ...