INSTALLATION
PROCEDURE
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator with the 2 bolts. Torque: 52 N·m {530 kgf·cm, 38 ft·lbf} |
|
(b) Install the wire harness clamp bracket with the bolt. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} |
|
(c) Connect the generator wire with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(d) Install the terminal cap.
(e) Connect the generator connector.
2. INSTALL WIRE HARNESS CLAMP BRACKET
(a) Install the clamp bracket with the bolt. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} |
|
(b) Attach the wire harness clamp to the clamp bracket.
3. INSTALL V-RIBBED BELT
HINT:
See page
4. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
5. INSTALL COOL AIR INTAKE DUCT SEAL
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ).
Oxygen (A/F) Sensor Signal Stuck Lean (Bank 1 Sensor 1) (P2195,P2196)
DESCRIPTION
HINT:
Although the DTC titles say oxygen sensor, these DTCs relate to the
air fuel ratio sensor.
Sensor 1 refers to the sensor mounted in front of the three-way catalytic
converter and located near the engine assembly.
...
Unlocking and locking the doors
►Front door handle
Grip the driver’s door handle to unlock the door. Grip the passenger’s door handle
to unlock all the doors.* Make sure to touch the sensor on the back of the handle.
The doors cannot be unlocked for 3 seconds after the doors ...
Components
COMPONENTS
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
...