Toyota Venza manuals

Toyota Venza: Disassembly

DISASSEMBLY

PROCEDURE

1. REMOVE PROPELLER SHAFT

(a) Place matchmarks on both flanges.

Text in Illustration

*1

Matchmark


(b) Remove the 4 nuts, 4 bolts and 4 washers.

2. REMOVE INTERMEDIATE SHAFT

(a) Place matchmarks on the intermediate shaft and rear propeller shaft.

NOTICE:

Do not place matchmarks with a punch.

Text in Illustration

*1

Matchmark


(b) Using a hexagon wrench (6 mm), remove the 6 bolts, 2 washers and intermediate shaft from the rear propeller shaft.

3. REMOVE NO. 1 CENTER SUPPORT BEARING ASSEMBLY

(a) Using SST and a hammer, loosen the staked part of the nut.

SST: 09930-00010


(b) Using SST to hold the universal joint flange, remove the nut and washer

SST: 09330-00021

Text in Illustration

*1

Turn

*2

Hold


(c) Place matchmarks on the universal joint flange and intermediate shaft.

Text in Illustration

*1

Matchmark


(d) Hold the intermediate shaft in a vise using aluminum plates and remove the universal joint flange using SST.

SST: 09950-40011

09951-04020

09952-04010

09953-04030

09954-04010

09955-04061

09957-04010

09958-04011

NOTICE:

  • Be careful not to damage the universal joint flange.
  • Do not overtighten the vise.
  • Apply grease to the threads and end of the SST center bolt (09953-04030) before use.
Text in Illustration

*1

Turn

*2

Hold


(e) Remove the No. 1 center support bearing assembly and washer.

4. REMOVE NO. 2 CENTER SUPPORT BEARING ASSEMBLY

(a) Using SST and a hammer, loosen the staked part of the nut.

SST: 09930-00010


(b) Using SST to hold the universal joint flange, remove the nut and washer.

SST: 09330-00021

Text in Illustration

*1

Turn

*2

Hold


(c) Place matchmarks on the universal joint flange and intermediate shaft.

Text in Illustration

*1

Matchmark


(d) Hold the intermediate shaft in a vise using aluminum plates and remove the universal joint flange using SST.

SST: 09950-40011

09951-04020

09952-04010

09953-04030

09954-04010

09955-04061

09957-04010

09958-04011

NOTICE:

  • Be careful not to damage the universal joint flange.
  • Do not overtighten the vise.
  • Apply grease to the threads and end of the SST center bolt (09953-04030) before use.
Text in Illustration

*1

Turn

*2

Hold


(e) Remove the No. 2 center support bearing assembly and washer.

Removal
REMOVAL PROCEDURE 1. REMOVE TAIL EXHAUST PIPE ASSEMBLY (for 1AR-FE) 2. REMOVE TAIL EXHAUST PIPE ASSEMBLY (for 2GR-FE) 3. REMOVE CENTER EXHAUST PIPE ASSEMBLY (for 1AR-FE) 4. REMOVE CENTER ...

Inspection
INSPECTION PROCEDURE 1. INSPECT UNIVERSAL JOINT SPIDER ASSEMBLY (a) Check the spider bearing axial play by turning the flange while holding the shaft tightly. HINT: If necessar ...

Other materials about Toyota Venza:

Installation
INSTALLATION PROCEDURE 1. INSTALL CHECK VALVE GROMMET (a) Install a new check valve grommet to the brake booster assembly. 2. INSTALL BRAKE VACUUM CHECK VALVE ASSEMBLY (a) Install the brake vacuum check valve assembly to the brake booster assembly. 3. IN ...

Cold Start Ignition Timing Performance (P050B)
DESCRIPTION This monitor will run when the engine is started at an engine coolant temperature of -10 to 50°C (14 to 122°F). The DTC is stored after the engine idles for 13 seconds (2 trip detection logic). The DTC is designed to monitor the ignition ti ...

Fuel Sender Gauge Assembly
Components COMPONENTS ILLUSTRATION Removal REMOVAL PROCEDURE 1. DISCHARGE FUEL SYSTEM PRESSURE (a) Discharge fuel system pressure (See page ). 2. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some syste ...

© 2016-2024 Copyright www.tovenza.com

0.1422