READINESS MONITOR DRIVE PATTERN
1. PURPOSE OF READINESS TESTS
HINT:
Many state Inspection and Maintenance (I/M) programs require the status of vehicle Readiness Monitor to show Complete before beginning emission tests.
CAUTION:
Strictly observe posted speed limits, traffic laws, and road conditions when performing these drive patterns.
NOTICE:
These drive patterns represent the fastest method of satisfying all conditions necessary to achieve complete status for each specific Readiness Monitor.
In the event of a drive pattern being interrupted (possibly due to factors such as traffic conditions), the drive pattern can be resumed. In most cases, the Readiness Monitor will still achieve complete status upon completion of the drive pattern.
To ensure completion of the Readiness Monitors, avoid sudden changes in vehicle load and speed (driving up and down hills and/or sudden acceleration).
2. VVT SYSTEM MONITOR
(a) Refer to Confirmation Driving Pattern [P0011] (See page
).
(b) Refer to Confirmation Driving Pattern [P0014] (See page
).
3. CATALYST MONITOR (ACTIVE AIR FUEL RATIO CONTROL TYPE)
(a) Refer to Confirmation Driving Pattern [P0420] (See page
).
4. EVAP SYSTEM MONITOR (KEY OFF TYPE)
(a) Refer to Confirmation Driving Pattern [EVAP System] (See page
).
5. AIR FUEL RATIO AND HEATED OXYGEN SENSOR MONITORS (ACTIVE AIR FUEL RATIO CONTROL TYPE)
(a) Refer to Confirmation Driving Pattern [P0136] (See page
).
(b) Refer to Confirmation Driving Pattern [P2195] (See page
).
6. AIR FUEL RATIO AND HEATED OXYGEN SENSOR HEATER MONITORS (FRONT AIR FUEL RATIO AND REAR HEATED OXYGEN SENSOR TYPE)
(a) Refer to Confirmation Driving Pattern [P0031] (See page
).
(b) Refer to Confirmation Driving Pattern [P0037] (See page
).
Problem Symptoms Table
Terminals Of EcmInspection
INSPECTION
PROCEDURE
1. INSPECT REAR POWER WINDOW REGULATOR MOTOR ASSEMBLY LH
(a) Apply positive (+) battery voltage to connector terminal 2 (B).
NOTICE:
Do not apply positive (+) battery voltage to any terminals other than
terminal 2 ( ...
Data List / Active Test
DATA LIST / ACTIVE TEST
1. DATA LIST
HINT:
Using the Techstream to read the Data List allows the values or states of switches,
sensors, actuators and other items to be read without removing any parts. This non-intrusive
inspection can be very useful bec ...
Removal
REMOVAL
PROCEDURE
1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable
is reconnected (See page ).
2. REMOVE COOL AIR INTAKE DUCT SEAL
3. REMOVE NO. 1 ENGINE CO ...